Skip to content
Supply & Delivery

The shipment must arrive as ordered.

Product, quantity, records and delivery terms need to match what was agreed.

Lot record sequence from sample identity through receipt confirmation

One lot. Six checks.

01

Sample identity

The lot is identified and sampling details are recorded. A retained sample is kept where required.

02

Assay record

Analysis results are checked against the agreed product specification.

03

Weight record

Measured weight is documented against that identity.

04

Package & seal

Packaging and seal details are recorded where the shipment method requires them.

05

Transfer record

Each handoff is documented so the shipment can be traced from one party to the next.

06

Receipt confirmation

The received material and documents are compared with the order and any differences are resolved.

Before movement

The shipment begins with the buyer's requirements.

A usable mineral product is defined by more than its name or headline grade. We establish what the customer can receive, how it will be measured and which terms govern the transaction before material is prepared for dispatch.

Product qualification

Agree what acceptable material looks like.

Mineral species, product form, chemistry, impurity limits, moisture, particle size and any radiological or handling requirements are matched to the customer's intended process. Sampling, assay method and acceptance tolerances are agreed at the same time.

Commercial agreement

Set the terms before the lot moves.

The order establishes quantity, pricing or settlement basis, packaging, shipment schedule, delivery destination and the agreed division of freight, customs and risk responsibilities. Documents and inspection requirements are identified before loading.

From preparation to receipt

One order. A controlled journey.

The inspection record answers whether the lot is ready. Commercial execution answers a different question: who carries each responsibility as it leaves the plant, crosses borders where applicable and reaches the customer.

01 / Prepare

Make the order-ready product.

Processing, sizing, moisture control and packaging follow the agreed specification. Lots remain identified and segregated as needed so that test results and shipping records refer to the material being sold.

02 / Verify

Check before dispatch.

The release decision reconciles the final assay and weight with the buyer's acceptance range. Where independent inspection is agreed, its result forms part of the dispatch authorization; nonconforming material can be reworked, reclassified or held.

03 / Move

Keep the documents with the lot.

Export documentation, freight arrangements, import requirements where applicable and onward transport remain tied to the identified shipment. Each transfer provides a record of who handled it and when.

04 / Confirm

Close the delivery properly.

Receipt is checked against the order, shipping records and agreed acceptance method. Any shortage, damage or quality discrepancy is documented and resolved under the commercial terms before settlement is closed.

Beyond one shipment

The next order is earned by the last one.

Supply performance is measured over time. Yield variation, preparation losses, lead times, transport interruptions and acceptance results give Zilo and its customers practical information for planning future volume and adjusting delivery schedules.

The resulting record of acceptance, exceptions and actual delivery performance becomes a practical foundation for recurring orders and stronger customer planning.

Discuss mineral supply →